SSSSS

Pictures of work in progress,December 2020.

2020-12-28 09:07:00
admin
Original
91
Summary :Completion of installation of walk-in cooler at preparation area, kitchen dumbwaiters, and kitchen hoods. The continuation of the installation of major kitchen equipment. The arrival of interior wood paneling, decorative stone for floor, and fixture walls. The preparation of interior doors and hardware installation.

Article Category
Contact Us
Email : info@reddragon.vip
Address : 680 South Coast Highway, Laguna Beach, CA 92651